T minus 9 days to departure for Colorado.
Ken Frey called to let me know that he had found the following:
1) Left front ball joint so loose that it is hitting the crossmember
2) Right front bearing is bad
3) One bogie pin is worn but okay for a while.
4) My by-the-eye allignment stinks.
In addition to the above he is going to:
1) Install actual mufflers in place of the noisy glass packs which
have prompted the kids to call it the "F*rter home".
2) Six wheel allignment (seven including the spare?)
3) Lean out the idle mixture to reduce the amount of raw gas that
comes out of the tail pipe at idle.
In the five days I will have the coach prior to departure I will attempt
to:
1) Install new furnace
2) Install roof pod
3) Install bike rack
4) Fabricate console to hold stereo, guages and new A/C vents
5) Install addional air vents from A/C unit
6) Install 6th blind
7) Install kitchen overhead cabinet, light and microwave
8) Install Inverter to power microwave
9) Patch leaky #2 tank
10) Check all systems and pack
In the time I have left over, I have another list of things to do....Oh,
I am also working next week....I guess I may not get to one or two
things before I go.
Ron and Julie
73 Painted Desert (Not as done as I would like)
Ken Frey called to let me know that he had found the following:
1) Left front ball joint so loose that it is hitting the crossmember
2) Right front bearing is bad
3) One bogie pin is worn but okay for a while.
4) My by-the-eye allignment stinks.
In addition to the above he is going to:
1) Install actual mufflers in place of the noisy glass packs which
have prompted the kids to call it the "F*rter home".
2) Six wheel allignment (seven including the spare?)
3) Lean out the idle mixture to reduce the amount of raw gas that
comes out of the tail pipe at idle.
In the five days I will have the coach prior to departure I will attempt
to:
1) Install new furnace
2) Install roof pod
3) Install bike rack
4) Fabricate console to hold stereo, guages and new A/C vents
5) Install addional air vents from A/C unit
6) Install 6th blind
7) Install kitchen overhead cabinet, light and microwave
8) Install Inverter to power microwave
9) Patch leaky #2 tank
10) Check all systems and pack
In the time I have left over, I have another list of things to do....Oh,
I am also working next week....I guess I may not get to one or two
things before I go.
Ron and Julie
73 Painted Desert (Not as done as I would like)