Plumbing

darren paget

New member
Oct 28, 1998
1,553
0
0
Hey Manny. I received the macerator today. That T is a piece of work. I
spent sunday mapping and laying out my dump system and undercarriage
plumbing. More work than I initially figured. I think I have it down now
and as soon as I do some frame cutting, gusseting and bracing I will be
installing it.
I also, finally, got the gas line hooked up to the generator. After some
initial sputtering and belching, I found that the choke was fully open.
Adjustment and purring like a kitten. That 2800 Onan is sure nice and
quiet. Runs my A/C no sweat. All I have to do is to make my locker door
for that side with some custom venting and I'll be stylin.
Waiting for some powder coated wall panels. When they come, I think, it
will look like I have done a lot overnight. Lots of work yet but I am
almost off of sleeping on the floor. More later. Darren

- --
Darren Paget
76 Experimental
Another Fab Day
http://www.TZEplus.com