Engine Hoist

bdub

Well-known member
Aug 31, 1998
3,234
423
83
74
Lake Brownwood, Texas
www.bdub.net
I'll post this engine hoist for sale tomorrow on gmcws. Thought I'd let
ya'll know first in case someone here wants first shot at it.

- -----------------------------------------------------------------
I have a custom made engine hoist and trolley system designed to remove and
install an engine in the 26 ft. model. I want to list it for sale in
the"market Place" I will accept any reasonable offer.
Ed Staal, 310-374-7678, email - elaatse
- ---------------
I should make a correction, it is just the trolley, no hoist attached.
It is in Redondo Beach, CA. I think it is too big and heavy to be shipped.
The trolley is 11 feet long. I can have some pic's available.
- --------------------------------------------------------------------

bdub
 
Hummmmm nice place to live,
I guess I should come get the pictures...... nah I have to go to Or.

gene

>I made my frame with no problem using $28 of remnants from the steel yard,=
a
>few 3/8" bolts and some 2' channel and angle iron that I had laying around.
>The transverse triangular bipods end frames are 0.062 wall 2X2 square=
tubing
>legs and 2" angle for the base supports. The main beam is a 2x4x0.0125 in.
>wall tubing I removed the rear view mirror to allow the beam to be as high
>and as far forward as possible. The trolley was made from two 2" fixed
>steel casters bolted under a 2" channel. The casters ride on top of the
>2X4X0.125 wall tube The come-along is hung on a bolt running through 1/8"
>straps that attach=E9 to the channel above the casters anddrop down=
alongside
>the 2X4 tube on each side. Short angle braces went from each bi-pod leg to
>the beam. The 2x2 sq tubes were notched to help support the beam similar=
to
>the way a sawhorse is made.All members were simple pinned joints using the
>bolts, so there are no bending moments in any of the support members except
>in the main beam. Remember we are only dealing with 600lb or so therefore
>hardware grade bolts are ok since they are all in double shear. I did use=
a
>grade 5 bolt for the long come along support to eliminate any bending
>
>The whole thing took me a half a day to fabricate using my hand circular=
saw
>and a metal cutting friction blade. It takes five minutes to assemble or
>remove. I was able to do the whole engine job working alone. As you well
>know the most work is re-installing all the accessories. The actual=
mate-up
>was easy since I fabricated a lifting plate with a machinery eye attached=
at
>the carburetor mounting. This held the engine very level and required only
>minor jockeying to mate with the transmission. It was not necessary to
>remove the right axle, only the axel bearing to engine attachment.
>I will send the pictures to Gene Fisher with notes and dimensions to put on
>his web site since my scanner is out.
>I can give more details off line, or it is available to any one who wants=
to
>make the trip to beautiful Yosemite area.
>Frank Condos
>Ahwahnee, CA
>
>
Genef -- 77PB/ore/ca
GMC MOTORHOME INFORMATION
mr.erf
http://www.california.com/~eagle/
 
Here is what many of you have been waiting to see. Frank's hoist and=20
trolly to remove the engine from the top

http://albums.photopoint.com/j/ViewPhoto?u 128904&a 7411134&p 25209792

gene

>To: gmcmotorhome
>From: gene
>Subject: re: GMC: Engine Hoist
>

>>I made my frame with no problem using $28 of remnants from the steel yard,=
a
>>few 3/8" bolts and some 2' channel and angle iron that I had laying=
around.
>>The transverse triangular bipods end frames are 0.062 wall 2X2 square=
tubing
>>legs and 2" angle for the base supports. The main beam is a 2x4x0.0125=
in.
>>wall tubing I removed the rear view mirror to allow the beam to be as high
>>and as far forward as possible. The trolley was made from two 2" fixed
>>steel casters bolted under a 2" channel. The casters ride on top of the
>>2X4X0.125 wall tube The come-along is hung on a bolt running through 1/8"
>>straps that attach=E9 to the channel above the casters anddrop down=
alongside
>>the 2X4 tube on each side. Short angle braces went from each bi-pod leg=
to
>>the beam. The 2x2 sq tubes were notched to help support the beam similar=
to
>>the way a sawhorse is made.All members were simple pinned joints using the
>>bolts, so there are no bending moments in any of the support members=
except
>>in the main beam. Remember we are only dealing with 600lb or so therefore
>>hardware grade bolts are ok since they are all in double shear. I did use=
a
>>grade 5 bolt for the long come along support to eliminate any bending
>>
>>The whole thing took me a half a day to fabricate using my hand circular=
saw
>>and a metal cutting friction blade. It takes five minutes to assemble or
>>remove. I was able to do the whole engine job working alone. As you well
>>know the most work is re-installing all the accessories. The actual=
mate-up
>>was easy since I fabricated a lifting plate with a machinery eye attached=
at
>>the carburetor mounting. This held the engine very level and required=
only
>>minor jockeying to mate with the transmission. It was not necessary to
>>remove the right axle, only the axel bearing to engine attachment.
>>I will send the pictures to Gene Fisher with notes and dimensions to put=
on
>>his web site since my scanner is out.
>>I can give more details off line, or it is available to any one who wants=
to
>>make the trip to beautiful Yosemite area.
>>Frank Condos
>>Ahwahnee, CA

Genef -- 77PB/ore/ca