So its has been two weeks and the following is in stalled by my self
New engine
new trans
new front end
new brake lines
rebuilt original radiator
two piece fan shroud
remote trans cooler
radiator rock guard
I have made a modified a frame hoist and gantry with 1/4" of play it all came out the top with ease. good thing I took this route as it allowed me to
get the new suspension parts in as well as the new axels and brakes.
easy real easy
engine was out in 2 hours , trans out in an hour took my time putting all back in so I dont have to climb back under.
This can be done by your self, not recommended but when you live in an area where people dont maintain their anything its what you are dealt with.
Frank Condo was a great help on the hoist.
--
1974 GMC Sequoia 26'
New engine
new trans
new front end
new brake lines
rebuilt original radiator
two piece fan shroud
remote trans cooler
radiator rock guard
I have made a modified a frame hoist and gantry with 1/4" of play it all came out the top with ease. good thing I took this route as it allowed me to
get the new suspension parts in as well as the new axels and brakes.
easy real easy
engine was out in 2 hours , trans out in an hour took my time putting all back in so I dont have to climb back under.
This can be done by your self, not recommended but when you live in an area where people dont maintain their anything its what you are dealt with.
Frank Condo was a great help on the hoist.
--
1974 GMC Sequoia 26'