All the preplanning is paying off

Bob Dunahugh

New member
Sep 17, 2012
2,784
4
3
Been out in this GMC now for a week. Except for the new Chinese fuel pump failure. It's PERFECT for Linda, wheelchair, and me. As Linda, and I had a discussion tonight about what needs to be changed when we get home. We couldn't come up with a thing. With the expanded storage. We now have empty cabinets still. The Moan shower system works great. The flat aluminum shower floor let no water get out of the shower area. Lighting. Even, and bright. Almost no sound from the rain on the roof. It's been a little cool at night. Haven't needed the furnace on. Trans is working great. But still changing it next month. Then get the EFI on with spark control. Bob Dunahugh 78 Mouse House