Finally got to install my stainless oil cooling hoses, time from all 6 down
to 6 down again, including oil change, lub and engine compartment survey
for damage ETC: was 6 hours. this was not rushed, it was a slow inspection
for wear and components needing replacement.
The hoses from JR Slaten went in with no problems , the only difficulties
was with removing the old lines, had to cut one to remove it.
these new lines should out last the coach.
Thanks JR
John & Brenda Szalay
73 GMC
to 6 down again, including oil change, lub and engine compartment survey
for damage ETC: was 6 hours. this was not rushed, it was a slow inspection
for wear and components needing replacement.
The hoses from JR Slaten went in with no problems , the only difficulties
was with removing the old lines, had to cut one to remove it.
these new lines should out last the coach.
Thanks JR
John & Brenda Szalay
73 GMC